Global Civil and Mining were contracted by Parkwater Corporation for the Stage 2 expansion to the Cowaramup Parkwater subdivision. The project included the pre-strip of subsoil for rehabilitation across the whole subdivision before levelling the residential lots to design, excavating the road reserve to sub-grade and integrating services trenches for Water, Power and Sewer into the finished surface.
PROJECTS
MINING
Kimberley Borrow Pits
Global Civil and Mining were contracted by Walyarra Contracting to supply Main Roads Kimberley with a Wirtgen 2500 Surface Miner to produce sub base material for use on the Cape Leveque Road and the Derby Gibb River Road.
Carmichael Rail
BMD contracted Global Civil and Mining to supply a Wirtgen 2500SM to cut material for the Carmichael Rail alignment project. The project was completed over a 3 month period during the wet season, the surface miner was able to continue working without delay.
Yandi Rail Crossing and Road Upgrade
To facilitate BHPs Iron Ore expansion, parts of the access roads and crossings need upgrading to allow better access for people and equipment. GCM mobilised a Wirtgen 2500 Surface Miner (2500SM) to Yandi to assist Austral Constructions in the excavation of a hill adjacent to a rail crossing near Yandi mine site.
Yandi Access Road
GCM mobilised a Wirtgen 2500 Surface Miner (2500SM) to Yandi to assist Austral Constructions in the excavation of the new access road alignment. Using the Surface Miner, the road material was crushed to less than 100mm in size, mixed, blended and replaced.
Westbrook Estate Subdivision
GCM carried out a trial of a 2500SM surface miner, in the Westbrooke Estate subdivision in the Western region of Melbourne in August 2016.